@inproceedings{f66eaa0a63a7486ea7f4bd4d9998f51c,
title = "Field verification of control performance of a LFC system to make effective use of existing power generation and battery energy storage system",
abstract = "As one of the measures to realize large-scale renewable energy penetration, utilization of BESS (battery energy storage system) in LFC (load frequency control) is expected. In this paper, the control performance of a LFC system to make effective use of existing LFC thermal unit and BESS is verified by utilizing Miyako Island field test facility. The field test results show that the proposed LFC system can more suppress frequency deviation than LFC using only existing LFC unit and can significantly reduce the required capacity of BESS compared with LFC using only BESS.",
keywords = "Battery Energy Storage System, Field Verification, Load Frequency Control, Renewable Energy",
author = "Hiroyuki Amano and Wataru Shima and Tomonori Kawakami and Toshio Inoue and Yasushi Uehara and Hirofumi Nakama and Yuji Oshiro and Masayoshi Toguchi",
year = "2013",
doi = "10.1109/ISGTEurope.2013.6695242",
language = "英語",
isbn = "9781479929849",
series = "2013 4th IEEE/PES Innovative Smart Grid Technologies Europe, ISGT Europe 2013",
booktitle = "2013 4th IEEE/PES Innovative Smart Grid Technologies Europe, ISGT Europe 2013",
note = "2013 4th IEEE/PES Innovative Smart Grid Technologies Europe, ISGT Europe 2013 ; Conference date: 06-10-2013 Through 09-10-2013",
}